📍 Zhongshan HQ · Memory & Power Import Substitution · Taiwan Engineering · US Sales Support 📧 sales@hgchips.net  |  ☎ +86 760 8992 4799  |  💬 WhatsApp: +852 9298 5589 (management) / +852 9298 5590 (sales)  |  🕑 Quote reply < 24h
Home / Resources / Samples & lead times

Samples and lead times: how a first order actually runs

Most second-source projects stall in the same place — not on price, but on whether the buyer can prove the part works before committing to volume. This page sets out how a first order runs with HGCHIPS: what the sample quantity is, what ships with it, how long stock and non-stock lines take, and what to send us to get a usable answer.

Samples and lead times apply to the memory and power lines we carry: DDR3 (1.35 V / 1.5 V, VFBGA-96), DDR4 (1.2 V, FBGA-78/96) and LPDDR4 / LPDDR4X (up to 4266 MT/s, VFBGA-200), plus ADI LTM46xx / LTM80xx µModule drops. State the original part number, target density (for example 8 Gb) and quantity when you request a sample, so the quote can be matched to the correct speed grade and package.

At a glance

The numbers that decide a first order

Sample quantity

From 10 pcs — enough for incoming inspection, validation on your platform and a burn-in check

Sample cost

Credited against your first production order, so validating before you commit does not add to programme cost

Stock lines

48h dispatch from Shenzhen on parts we physically hold

Quotation

Within 24 business hours, including the compatibility check

Lot documentation

Per-lot inspection and validation records, plus datasheets and compatibility notes for the part number

Material compliance

SGS / RoHS / REACH statements where applicable

Sequence

How a first order runs, step by step

  1. Send the exact marking from your BOM, your monthly usage and the grade you need. The marking matters more than the family name: suffix letters change footprint height, temperature grade or packing, and a substitution that looks right on paper can fail on the board.
  2. We return a compatibility check and quotation within 24 business hours — the fields compared against the original datasheet, the grade quoted, and the lead time for that grade.
  3. You order samples from 10 pcs. Sample cost is credited against your first production order.
  4. Validate on your own platform. Patch measurements and a working prototype are not the same as qualification — test at your temperature extremes and run a burn-in check.
  5. Release production. Stock lines dispatch in 48 hours from Shenzhen; scheduled shipments and firm pricing are available for long-lifecycle programmes.
Documentation

What you can see before you commit

If a supplier cannot show per-lot records, you cannot know which die revision you are approving. That is the test to apply to us as much as to anyone else.

Lead times

Stock versus non-stock — and why we quote rather than promise

Lead time is the one number a supplier cannot honestly generalise. It depends on the part number, the grade, and whether we physically hold the lot. So we split it:

CaseWhat we state
Part held as stock48h dispatch from Shenzhen — quoted from a physical position
Non-stock, standard gradeConfirmed lead time in the quotation, per part number
Long-lifecycle programmeScheduled shipments with firm pricing, so unit cost does not move with the spot market
Grade not heldWe say so and quote the lead time for that grade, rather than offering a different grade
Scope

What this page does not claim

Sample and lead-time terms are indicative until confirmed in a quotation, and they apply to the specific part number and grade quoted. Nothing here replaces the qualification work on your own platform — a delivered sample that boots is not an approved part.

FAQ

Common questions

What is the minimum order quantity for samples?

Sample quantities start at 10 pcs. That is normally enough to run incoming inspection, functional validation on your own platform and a burn-in check, which is the same sample plan described in our qualification checklist.

Is the sample cost credited against production?

Yes. The sample cost is credited against your first production order, so validating before you commit does not add to the programme cost.

How fast do stock lines ship?

Stock lines dispatch in 48 hours from Shenzhen. Non-stock and long-lifecycle quantities are quoted with a confirmed lead time rather than a promise, because the honest answer depends on the specific part number and grade.

What documentation ships with a sample or a lot?

Per-lot inspection and validation records, datasheets and compatibility notes for the specific part number, and SGS / RoHS / REACH statements where applicable. A sample test report can be shared before you order.

Can I see a test report before committing?

Yes. We share a sample test report for your target part number, and you can book a live video test on WhatsApp to watch the qualification run rather than reading a PDF.

How long does a quotation take?

Compatibility check and quotation within 24 business hours. To get a usable answer rather than a catalogue link, send the exact marking from your BOM, your monthly usage and the grade you need.

What if the grade I need is not in stock?

We tell you that rather than substituting something similar. Industrial-grade parts (-40 to +95 C) are held in dedicated lines; where a grade is not held, the quotation states the lead time for that grade instead of offering a different one.

Request samples or a quote

Send the exact marking, your monthly usage and the grade you need — we reply within 24 business hours with the compatibility check and the lead time for that grade.

Request a Quote Search cross reference